Completed projects

R. S. ENGINEERING" Ltd. REFERENTIAL LIST OF COMPLETED PROJECTS - CATALOG

 

 

  • MULIFAMILY RESIDENTIAL BUILDING, Residential district "Suha reka", Sofia – unfolded built-up area = 6 758 sq.m. - Principal Contractor from 2017

 

  • MULIFAMILY RESIDENTIAL BUILDING KRISTA, Residential district "Krastova vada", Sofia – unfolded built-up area = 12 405 sq.m. - Principal Contractor from 2017

 

  • ADMINISTRATIVE BUILDING, Cherni vrah Blvd., Sofia– unfolded built-up area = 4 360 sq.m.- Principal Contractor from 2016;

 

  • NEW BUILDING FOR PRODUCTION OF SOLID DOSAGE MEDICINAL FORMS OF CANDY PHARMA, Bojurishte - unfolded built-up area = 7 808 sq.m. - Principal Contractor from 2016;

 

  • RESIDENTIAL COMPLEX THE ROYAL PARK RESIDENCE, Sofia, Residential district "Boyana", unfolded built-up area = 15 531 sq.m. - Principal Contractor from 2015;

 

  • DESIGN AND RECONSTRUCTION OF BUILDING FOR THE PURPOSE OF THE DISTRICT COURT AND THE DISTRICT PROSECUTOR`S OFFICE OF SOFIA, Sofia - unfolded built-up area = 31 100 sq. m. - Contractor from 2013, placed in service in 2015

 

  • Reconstruction and renovation of the Auditorium 272 and Lobby space of "St. Kliment Ohridski" University - Sofia– unfolded built-up area = 1030 sq. m. - Sofia, contractor from 2014 - placed in service in 2015

 

  • LANDSCAPING AND DEVELOPMENT OF ZONED LAND I – sport, attractions, planting, residential district 334A, the city of Stara Zagora – built-up area = 80 530 sq. m. - contractor from 2014, placed in service in 2015

 

  • SLANTSE-1879 COMMUNITY CENTER, town of Ihtiman - overhaul for improving energy efficiency - unfolded built-up area = 2 438 sq.m. - Main contractor - from 2015

 

  • CONSTRUCTION OF SEWER PIPELINE from the village Trudovets to Urban wastewater treatment plant, Botevgrad - Principal Contractor from 2014;

 

  • FAMILY RESIDENTIAL HOUSE, Residential district Vitosha, Sofia, unfolded built-up area = 207 sq. m. - Principal Contractor, placed in service in 2013

 

  • FAMILY RESIDENTIAL HOUSE, the village of Lozen, Sofia, unfolded built-up area = 207 sq. m. - Principal Contractor, placed in service in 2013

 

  • OFFICE BUILDING, Sofia, Residential district "Malinova dolina" - unfolded built-up area = 473 sq. m. - Principal Contractor from 2013

 

  • ADAPTATION OF CENTRAL MINERAL BATH FOR MUSEUM OF HISTORY OF SOFIA, Sofia – contractor, placed in service in 2014;

 

  • "ROTUNDA AND SURROUNDING AREA" IN CENTRAL TOWN AREA – "FORUM", Botevgrad - Principal Contractor from 2012

 

  • MULIFUNCTIONAL SPORTS PALACE "BOTEVGRAD", Botevgrad, unfolded built-up area = 9 520 sq. m. - Principal Contractor from 2012

 

  • REPAIRS AND RECONSTRUCTION OF EXISTING RESIDENTIAL BUILDING, RESIDENTIAL DISTRICT "OVCHA KUPEL", SOFIA - unfolded built-up area = 650 sq. m. - Principal Contractor from 2013

 

  • RECONSTRUCTION OF EXISTING BUILDING – PUBLIC BATHS IN RESIDENTIAL BUILDING, Botevgrad - unfolded built-up area = 475 sq. m. - Principal Contractor from 2013

 

  • FAMILY RESIDENTIAL HOUSES in "Zelin" villa area, Botevgrad - unfolded built-up area = 250 sq. m., unfolded built-up area = 230 sq. m. - Principal Contractor from 2011 - 2013

 

  • RESIDENTIAL BUILDING WITH SHOPS FOR INDUSTRIAL GOODS AND GARAGES, Botevgrad - unfolded built-up area = 480 sq. m. -Principal Contractor, placed in service in 2013

 

  • PASSIVE RESIDENTIAL HOUSE, the village of Kokalyane - unfolded built-up area = 425 sq. m. - Principal Contractor from 2011

 

  • FAMILY RESIDENTIAL HOUSE, Residential district "Dragalevtsi", Sofia, unfolded built-up area = 270 sq. m. - Principal Contractor, placed in service in 2013

 

  • FAMILY RESIDENTIAL HOUSE, "Zelin" villa area, Botevgrad, unfolded built-up area = 335 sq. m. - complete engineering implementation, placed in service in 2012

 

  • RECONSTRUCTION AND MODERNIZATION OF PRIMARY SCHOOL "VASIL LEVSKI", Botevgrad, unfolded built-up area = 4 000 sq. m. - Principal Contractor in 2011

 

  • RESIDENCE BUILDING WITH WITH SHOPS, OFFICE, CENTRE FOR MEDICAL CARE, CHILDREN CLUB AND UNDERGROUND PARKING LOTS, two sections, Residential district "Manastirski livadi-zapad", Sofia, unfolded built-up area = 3 750 sq. m. – complete engineering implementation, placed in service in April 2012

 

  • FAMILY RESIDENTIAL HOUSE, "Zelin" area, region of Botevgrad, built-up surface 300 sq.m., complete engineering implementation, 2010.

 

  • RESIDENTIAL BUILDING WITH SHOPS, OFFICES AND GARAGES, "PODUENE" region, housing quarter 51, "Hadzhi Dimitar" area, plot III-627, 24, Vidini kuli Street, Sofia, built-up surface 2000 sq.m., main contractor, 2010.

 

  • RESIDENTIAL COMPLEX "PANORAMA" - Botevgrad, Vassil Levski housing quarter, unfolded built up area 14 000 sq.meters - complete engineering implementation (2008 - 2010)

 

  • RESIDENTIAL BUILDING WITH OFFICES, SHOPS AND UNDERGROUND GARAGES, Druzhba 2 quarter, unfolded built-up surface = 5000 sq.m., 2008.

 

  • ADMINISTRATIVE BUILDING OF THE STATE COMMISSION FOR INFORMATION SECURITY, Sofia, Tzarigradsko shosse blvd - 7th km, (2007-2008) - contractor

 

  • HOLIDAY VILLAGE "RIBARITZA", main contractor, since 2007

 

  • RESIDENTIAL BUILDING WITH UNDERGROUND GARAGES, quarter 174a, Gardova glava area, unfolded built-up surface=1500 sq.m., main contractor, since 2007.

 

  • RESIDENTIAL BUILDING in the "Lozenets" quarter, unfolded built-up area 1500 sq.m., main contractor

 

  • RESIDENTIAL BUILDING WITH SHOPS AND UNDERGROUND GARAGES, unfolded built-up area 4900 sq. m., Sofia, Simeonovsko shaussee Blvd, complete engineering implementation (March 2007)

 

  • RESIDENTIAL VILLAGE OF 8 FIVE-STOREY BUILDINGS "DIPLOMATIC GARDENS" - main contractor (March 2007)

 

  • RESIDENTIAL BUILDING WITH SHOPS, Sofia, "Rodopski izvor"str., unfolded built-up area=3000 sq.m. (03.2006), main contractor.

 

  • OFFICE BUILDING "SPESIMA" Sofia, unfolded built-up area=1000 sq.m. (since 02.2005), main contractor

 

  • RESIDENTIAL BUILDING WITH SHOPS, Sofia, "Pavlovo", unfolded built-up area=1000 sq.m. (03.2006), main contractor

 

  • OFFICE BUILDING, Sofia," Dragalevtsi", unfolded built-up area=1000 sq.m. (since 1.10.2005), complete engineering implementation

 

  • RESIDENTIAL BUILDING WITH SHOPS AND OFFICES, Sofia, "Simeonovsko shosse" Blvd., unfolded built-up area=3960 sq.m. (since 10.08.2005), completеd

 

  • TRADE CENTER "MAGGIE", Sofia,"Vihren" str. , unfolded built-up area=1000sq.m. (2005), main contractor, with Permit Certificate for Use

 

  • RESIDENTIAL BUILDING, Sofia, "Manastirski livadi - West" region, unfolded built-up area=3500 sq.m. (2005), main contractor

 

  • RESIDENTIAL BUILDING WITH SHOPS, Sofia "Ovcha koupel", unfolded built-up area=4500 sq.m. (2004-2005),main contractor, stage-finishing works

 

  • RESIDENTIAL BUILDING WITH OFFICE AND GARAGES, Sofia, "Ralevitsa" str., unfolded built-up area=1000 sq.m. (2005), complete engineering implementation

 

  • RESIDENTIAL BUILDING WITH OFFICE AND GARAGES, Sofia, "Ivan Sousanin" str. , unfolded built-up area=3000 sq.m. (2005), complete engineering implementation

 

  • RESIDENTIAL BUILDING in "Manastirski livadi" area, unfolded built-up area=1500 sq.m. (2004-2005), complete engineering, with Permit Certificate for Use

 

  • RESIDENTIAL BUILDING WITH SHOPS AND GARAGES, Sofia, 7a, "Krum Kyulyavkov" str., unfolded built-up area=2800 sq.m. (2004-2005), rough construction

 

  • RESIDENTIAL BUILDING WITH SHOPS AND UNDERGROUND GARAGES, Sofia, "Dianabad" quarter, unfolded built-up area=2500 sq.m.

 

  • (2004-2005), main contractor, complete finishing works

 

  • INTERNATIONAL CENTER FOR SCIENTIFIC GROUP MEETINGS, Sofia, unfolded built-up area=550 sq.m. (2003), complete engineering

 

  • GAMBLING AND COMPUTER HALLS "KALIMAN", (2003) - finishing works

 

  • TRADE AND ADMINISTRATIVE COMPLEX AND INDOOR SHOOTING RANGE, unfolded built-up area=650 sq.m. (2003), complete engineering implementation

 

  • PRIVATE RESIDENCES, unfolded built-up area=1000 sq.m. (2002), complete engineering implementation

 

  • A FAMILY RESIDENTIAL HOUSE, Sofia, unfolded built-up area=350 sq.m. (2001), complete engineering implementation

 

  • OVERHAUL OF THE FACTORY FOR INSULATORS IN MEZDRA (2001)

 

  • REPAIR WORKS OF BUILDING AND FACADE OF THE FACTORY FOR CONDUCTORS AND SEMI-CONDUCTORS in Botevgrad (2001)

 

  • WORKSHOP FOR PRODUCTION OF PVC PROFILES, unfolded built-up area=1500 sq.m. (2001) - reconstruction and finishing works

 

  • RESIDENTIAL COMPOUND (2 buildings), Sofia, unfolded built-up area=1000 sq.m. (2000/2001) - complete engineering implementation

 

  • A FAMILY RESIDENTIAL HOUSE in the town of Mezdra, unfolded built-up area=270 sq.m., (2001) - complete engineering implementation

 

  • RECONSTRUCTION AND REPAIR WORKS OF HOUSES, OFFICES AND STORES in Sofia and Plovdiv

 

  • FOUR-STAR HOTEL, town of Bansko, unfolded built-up area=5 760 sq.m., full construction

 

  • RESIDENTIAL BUILDING in "Buxston" quarter, Sofia, 18 apartments, Certificate for use No.16, (1996/98) - complete engineering implementation

 

  • KIOSK SWITCHGEARS OF SOFIA ELECTRICITY COMPANY, 1996 - main contractor

 

  • OFFICE BUILDING AND STOREHOUSE - "ISKAR" railway station, unfolded built-up area = 1 630 sq.m., Certificate No.16, (September, 1998/August, 2000) - complete engineering implementation

 

  • 12 STOREY RESIDENTIAL BUILDING "Druzhba" quarter, 1997 - subcontractor, finishing works

 

  • PRIVATE RESIDENTIAL HOUSES IN KOKALYANE - 1995; RAKITOVO - 1995; DRAGALEVTSI - 1996; BOYANA - 1996; BOYANA - 1997/98; SIMEONOVO - 1998/99; ZELIN, TOWN OF BOTEVGRAD - may-october 2000, TSARICHINA - 2001 - main contractor and consultant

 

  • HOTEL "ALBERT" - town of Bansko - 1994/95 - complete engineering implementation

 

  • HOTEL "TSAREV VRAH - RILSKI MANASTIR", unfolded built-up area = 3 300 sq. m. - 1994/95 - Main contractor and consultant



 

R.S. ENGINEERING Ltd. - DESIGN, CONSTRUCTION, ENTREPRENEURSHIP. 2025 © Web Design by AM Design. All rights reserved.

Top